Projects

S/n Client Project description Period
1 BENSHORE/NEW-CROSS Sweeping of Ekulama-1 Well no 03 and 017 April- May, 2016
2 AYAS/NECONDE Procurement, Fabrication and replacement of Leaking Batan-9T Wellhead Hook-up Spool January, 2016
3 ITERLEN Dredging of Flow station and Well Head areas  at Opuama Field of OML 40 August 2015 – Nov. 2015
4 NGC/ZCNL Installation of 36”x25km Gas Pipeline. EELP-02 January, 2014- February, 2014
5 NPDC Construction an Utra-Modern Community town hall at Ekpe Community, Delta state November,2014- June, 2015
6 NESTOIL/NPDC Dredging/Sweeping of 14 nos. well heads at Odidi, Delta State October, 2013- date.
7 BRITANICA HDD Welding of 36’’ x 1.365Km Gas pipeline August- Sept, 2013
8 SEPLAT Dredging/Canalization works at Sapele Operational area September, 2013
9 MATRIX ENERGY Sweeping of Matrix Energy Limited Jetty August, 2013
10 NIPP/ZCNL Installation of 18”x1.5Km Gas Pipeline and Early-Gas facility Hook-up/Tie-in at Geregu Power Plant Oct, 2012-July 2013
11 NITOMATT Dredging and Stock piling of sand for NITOMATT PROJECTS NIG. LTD at Otokutu village January, 2011- December, 2012
12 ZAKHEM/ NGC Fabrication and Welding, Installation Works for Pig Receiver Station at Oben-Node for the ELP-01 Oct. -Dec, 2012
13 AVEON OFFSHORE OAGM Project; Escravos-Dibi/Olero river tows May, 2012
14 ZAKHEM/ NGC Fabrication/Installation and Hook-up  at the ELP-01, Escravos Node April, 2012
15 PPMC/NNPC Provision of support services to JTF Troops on NNPC Esc-Warri Crude Oil pipeline Feb,2010- March, 2012
16 DSV PIPETRONIXNG/ GASLINK Fabrication and Hook-up/Tie-in of Gas De-sanding Unit at Iganmu Lagos Dec, 2011- April, 2012
17 ZAKHEM/ NGC Construction, Installation and Testing of 30’’ Pipeline River Crossings Segment Between Warri and Oben Aug, 2011- Dec, 2011
18 PPMC/NNPC Emergency Repair of NNPC Escravos- Warri 24’’ Crude Oil Pipeline at Kpokpo August, 2010
19 AVEON OFFSHORE OAGM Project Removal and River Tow from Dibi and Olero to Escravos (Labour supply) Oct- Dec, 2010
20 NITOMATT Dredging and Stock Pilling of sand at Otokutu community October, 2010- date
21 ZAKHEM/ NGC Hook-up and Tie-in with 18’’ Existing  Gas Pipeline at Geregu, Ajeokuta August, 2010
22 PPMC/NNPC Repair of 37 additional damaged points on the 24” diameter Escravos- Warri Crude Oil Pipeline Dec, 2009- Jan, 2010
23 PPMC/NNPC Repair of 20 damaged points on the 24” diameter Escravos- Warri Crude Oil Pipeline Sept, 2009- Nov, 2010
24 PPMC/NNPC Port Harcourt-Aba Pipeline Rehabilitation Project- System 2E/2EX Segment A, 0-9KM Dec, 2009- Jan, 2010
25 PPMC/NNPC Standby Repairs/maintenance of PPMC Pipelines and Faculties between Warri and Lokoja Call-out contract June, 2008-April, 2011
26 PPMC Sectioning of ruptured crude oil pipes at Idoah, Auchi Poly gate, Jattu Motor Park and Jattu Primary School Dec, 2008
27 PPMC/NNPC Sectional Replacement of Vandalized 16 inches Products Pipe at Ijegun, Lagos November, 2008
28 HHI, Warri Construction of Underground Pipe Supports for the Escravos Gas to Liquid Plant for HHI May, 2008
29 PPMC Sectional Replacement of System-2C 16  inches crude line at Agugu, Okpella, Edo State May, 2008
30 PPMC Sectional replacement of 6 inches product pipeline at Oloje, Ibadan April, 2008
31 PPMC Sectional replacement of Systems 16 inches crude oil pipeline at Igbonla, Lokoja March, 2008